Mapping Runs Before the First Panel Arrives
Model primary ducts, risers, cable trunks, and waste stacks early, aligning them with panel seams, chase zones, and service cavities deliberately reserved in the architectural concept. Tag and schedule penetrations by diameter, fire rating, and acoustic requirement, so factory cut-outs and sleeves are accurate. This approach reduces site drilling, protects panel durability, and ensures details like gaskets, collars, and wraps are specified, procured, and waiting before installation begins.